DocumentCode
810580
Title
University of Rochester Tandem Upgrading
Author
Purser, Kenneth H.
Author_Institution
Department of Physics, The University of Rochester, and General Ionex Corporation Rochester, New York
Volume
20
Issue
3
fYear
1973
fDate
6/1/1973 12:00:00 AM
Firstpage
383
Lastpage
386
Abstract
It has been clear for several years that some reasonably fundamental changes in the design of the High Voltage Engineering Corporation´s MP tandem accelerator are essential if this machine is to operate reliably at terminal potentials that are above 10 MV. Although the original specifications for the accelerator only guaranteed 10MV, the expectation was high that the actual voltage limit would be near 13-15MV. In practice, the voltage levels have only recently been achieved at the HVE test facility and at the AECL laboratories at Chalk River, Canada.
Keywords
Belts; Cryogenics; Electrostatics; Ion accelerators; Physics; Resistors; Spinning; Surges; Test facilities; Threshold voltage;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1973.4327125
Filename
4327125
Link To Document