Permitting a large cogeneration project in California
Author :
Vardeman, R. Don
Author_Institution :
Sun Exploration & Prod. Co., Valencia, CA, USA
Volume :
24
Issue :
6
fYear :
1988
Firstpage :
1160
Lastpage :
1167
Abstract :
The author discusses the permitting process which must be followed and major engineering and environmental issues which must be addressed to obtain a permit to construct a large cogeneration plant in the State of California. The specific cogeneration facility discussed is the proposed Midway Sunset Cogeneration Project (MCSP). The environmental issues considered are biological resources and air quality. The engineering issues considered are transmission-line engineering, transmission-system evaluation, electrical engineering, power-plant efficiency, and structural/civil/geotechnical engineering
Keywords :
air pollution detection and control; cogeneration; power transmission lines; California; Midway Sunset Cogeneration Project; air quality; biological resources; civil engineering; electrical engineering; engineering issues; environmental issues; geotechnical engineering; permitting process; power-plant efficiency; structural engineering; transmission-line engineering; transmission-system evaluation; Cogeneration; Environmental economics; Heat recovery; Out of order; Petroleum; Power generation economics; Production; Sun; Turbines; Water heating;
fLanguage :
English
Journal_Title :
Industry Applications, IEEE Transactions on
Publisher :
ieee
ISSN :
0093-9994
Type :
jour
DOI :
10.1109/28.17492
Filename :
17492
Link To Document :
بازگشت