  • Abstract
    How Southern California Edison modified its operating practices to meet NO/sub x/ constraints is described. To measure NO/sub x/ levels on a real-time basis, continuous emissions monitoring systems were installed at major gas plants. To capture the impact of NO/sub x/ constraints, a program was developed to assist operating personnel in formulating NO/sub x/-compliance strategies. System costs and benefits and future plans are detailed.<>
  • Keywords
    air pollution detection and control; nitrogen compounds; thermal power stations; NO/sub x/ air pollution control; Southern California Edison; continuous emissions monitoring systems; operating personnel; thermal power stations; Boilers; Command and control systems; Computational modeling; Computer simulation; Energy management; Environmental management; Meeting planning; Power generation; Power system planning; Switches;
  • fLanguage
    English
  • Journal_Title
    Computer Applications in Power, IEEE
  • Publisher
    ieee
  • ISSN
    0895-0156
  • Type

    jour

  • DOI
    10.1109/67.143268
  • Filename
    143268