DocumentCode :
814438
Title :
Cost aspects of AGC, inadvertent energy and time error
Author :
Snodgrass, T.
Volume :
5
Issue :
1
fYear :
1990
fDate :
2/1/1990 12:00:00 AM
Firstpage :
111
Lastpage :
118
Abstract :
Information is presented dealing with various cost aspects associated with automatic generation control (AGC), inadvertent energy, and time error. A general overview is given of the AGC operating costs. Quantification of the various operating costs is also provided. Reserve liability is described, and the rate-to-control costs when purchasing the AGC capability are outlined. Economic implications of inadvertent energy are considered. Finally, the cost impact of time error and time error correction are presented
Keywords :
economics; errors; power system computer control; AGC; automatic generation control; inadvertent energy; operating costs; rate-to-control costs; reserve liability; time error; Automatic control; Automatic generation control; Costs; Electrical equipment industry; Electricity supply industry; Error correction; Furnaces; Job shop scheduling; Power generation economics; Power system economics;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.49094
Filename :
49094
Link To Document :
بازگشت