DocumentCode :
815042
Title :
Measurement of some typical parameters in the realization of a signal management plant in railway diagnostics
Author :
Zanobini, Andrea ; Ghizzani, Massimo
Author_Institution :
Dept. of Electron. & Telecommun., Florence Univ., Italy
Volume :
52
Issue :
5
fYear :
2003
Firstpage :
1682
Lastpage :
1687
Abstract :
All transport of diagnostic information apparatus, necessary for safe and correct railway service, commits its running to the available medium: telephone cables. We have to manage with a multitude of protocols, each employed in its equipment. In this context, we have made some measures to verify that the line in the telephone cable from Florence Station to Rifredi Station, in Italy, was good. Then, we have tried to develop a plant and a telecommunication protocol, able to transfer data from a master and a certain number of slaves, with elements of versatility to adapt to different equipment. Obviously, this flexibility is limited by the characteristics of the considered channel.
Keywords :
protocols; railways; telecommunication signalling; telecommunication standards; telephone lines; Florence Station; Rifredi Station; diagnostic information apparatus; protocols; railway diagnostics; signal management plant; telecommunication protocol; telephone cables; Automatic control; Communication system control; Communication system traffic control; Control systems; Master-slave; Optical fiber cables; Protocols; Rail transportation; Telephony; Voltage;
fLanguage :
English
Journal_Title :
Instrumentation and Measurement, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9456
Type :
jour
DOI :
10.1109/TIM.2003.817912
Filename :
1240189
Link To Document :
بازگشت