Title :
Oconee Nuclear Station Unit 1 Startup Instrumentation and Control Experience
Author :
Coley, W.A. ; Bradham, O.S.
Author_Institution :
Duke Power Company Charlotte, N. C.
Abstract :
This paper discusses selected instrumentation and control experience from the startup of Oconee I which is an 886 MWe nuclear generating and first-of-a-kind design.
Keywords :
Cables; Detectors; Gamma ray detection; Instruments; Insulation testing; Insulators; Manufacturing; Nuclear power generation; Power generation; Reactor instrumentation;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1974.4327579