    Construction Experience within the Control and Spreading Room Complex

  • Author

    Sandel, A.L.

  • Author_Institution
    Bechtel Corporation San Francisco, California
  • Volume
    21
  • Issue
    1
  • fYear
    1974
  • Firstpage
    959
  • Lastpage
    960
  • Abstract
    This is a report on some construction problems within the control room and its associated cable spreading rooms that are due to space limitations, poor access for electricians, and state-of-the-art changes initiated during the testing phases of a nuclear generating plant. The effects of these problems on manpower are discussed. Solutions for the specific problems are suggested in conjunction with the overall recommendation for more active participation by the construction engineer with the designers, manufacturers, and clients in regard to initial layout of these critical areas, including wire space allowances in the control packages.
  • Keywords
    Cable shielding; Circuits; Flame retardants; Personnel; Power cables; Process control; Space technology; Testing; Wire; Wiring;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1974.4327584
  • Filename
    4327584