Construction Experience within the Control and Spreading Room Complex
Author
Sandel, A.L.
Author_Institution
Bechtel Corporation San Francisco, California
Volume
21
Issue
1
fYear
1974
Firstpage
959
Lastpage
960
Abstract
This is a report on some construction problems within the control room and its associated cable spreading rooms that are due to space limitations, poor access for electricians, and state-of-the-art changes initiated during the testing phases of a nuclear generating plant. The effects of these problems on manpower are discussed. Solutions for the specific problems are suggested in conjunction with the overall recommendation for more active participation by the construction engineer with the designers, manufacturers, and clients in regard to initial layout of these critical areas, including wire space allowances in the control packages.
Keywords
Cable shielding; Circuits; Flame retardants; Personnel; Power cables; Process control; Space technology; Testing; Wire; Wiring;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1974.4327584
Filename
4327584
Link To Document