DocumentCode :
818958
Title :
Operating Experience with LAMPF Main Beam Lines Instrumentation and Control System
Author :
van Dyck, Olin B. ; Harvey, A. ; Howard, H.H. ; Roeder, D.L.
Author_Institution :
Los Alamos Scientific Laboratory, University of California Los Alamos, New Mexico 87544
Volume :
22
Issue :
3
fYear :
1975
fDate :
6/1/1975 12:00:00 AM
Firstpage :
1570
Lastpage :
1573
Abstract :
Instrumentation and control (I&C) for the Los Alamos Clinton P. Anderson Meson Physics Facility (LAMPF) main beam line is based upon central computer control through remote stations which provide input and output to most devices. Operating experience shows that the ability of the computer to give high-quality graphical presentation of the measurements enhances operator performance and instrument usefulness. Experience also shows that operator efficiency degrades rapidly with increasing instrument response time, that is, with increasing delay between the time a control is changed and the result can be observed. For this reason, instrumentation upgrade includes speeding up data acquisition and display times to under 10 s. Similarly, television-viewed phosphors are being retained where possible since their instantaneous response is very useful. Other upgrading of the instrumentation system is planned to improve data accuracy, reliability, redundancy, and instrument radiation tolerance. Past experience is being applied in adding or relocating devices to simplify tuning procedures.
Keywords :
Centralized control; Control systems; Data acquisition; Degradation; Delay effects; Displays; High performance computing; Instruments; Mesons; Physics computing;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1975.4327937
Filename :
4327937
Link To Document :
بازگشت