DocumentCode
819151
Title
Status of the VICKSI Heavy Ion Accelerator
Author
Busse, W. ; Efken, B. ; Hilscher, D. ; Homeyer, H. ; Lettau, H. ; Lindenberger, K.H. ; Mahnke, H.-E. ; Maier, K.H. ; Ziegler, K. ; Anderberg, B. ; Hansen, P. ; Holm, S. ; Lindback, S. ; Malm, B. ; Harms-Ringdahl, L. ; Rohlin, J. ; Susini, A.
Author_Institution
Hahn-Meitner-Institut fÿr Kernforschung Berlin, Germany
Volume
22
Issue
3
fYear
1975
fDate
6/1/1975 12:00:00 AM
Firstpage
1643
Lastpage
1646
Abstract
The heavy ion accelerator combination VICKSI being built at the Hahn-Meitner-Institute in Berlin consists of a 6-MV Van de Graaff accelerator as injector into a 4 sector cyclotron with a mass energy product of 100. The primary design aim of this accelerator combination is 200 MeV for Carbon to Argon ions. The Van de Graaff including ion source and high voltage terminal is undergoing major reconstruction. The beam matching and transport system between the two accelerators comprising a stripper and two bunchers has been designed. The components for this system have been or will be ordered until March 1975. The cyclotron is being built by Scanditronix/Sweden. The four sector magnets will be assembled at Scanditronix for final shimming and field mapping. The RF-system is under test with low power. The new building for the cyclotron is completed except for interior work. The anticipated date for first beam injection into the cyclotron is November 1976.
Keywords
Argon; Assembly; Buildings; Cyclotrons; Ion accelerators; Ion sources; Magnets; Particle beams; Testing; Voltage;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1975.4327955
Filename
4327955
Link To Document