• DocumentCode
    821113
  • Title

    Harder and Smarter

  • Author

    Jones, Peter

  • Author_Institution
    ABB
  • Volume
    21
  • Issue
    1
  • fYear
    2007
  • Firstpage
    34
  • Lastpage
    37
  • Abstract
    This paper discusses how FACTS (flexible AC transmission system) and WAMS (wide area monitoring systems) technologies can help the UK to meet the challenge of connecting renewable generation. This is achieved by constructing the necessary grid reinforcements while getting more out of its current transmission network. However, the growth in renewable poses new challenges for the UK transmission network, particularly in Scotland. Transmission system reinforcements, which are necessary to carry the very large amounts of additional power generated by wind and marine from the more remote parts of the UK, may potentially be delayed by lengthy public enquiries. FACTS and WAMS technology could allow a flexible upgrade path for the existing transmission network, enabling it to work harder and smarter, while allowing time for the construction of necessary transmission reinforcement and help make the achievement of the UK Government 2010 Renewable Energy Targets more likely
  • Keywords
    electric power generation; flexible AC transmission systems; power grids; power system measurement; renewable energy sources; FACTS; UK Government 2010 Renewable Energy Targets; UK transmission network; WAMS; flexible AC transmission system; grid reinforcements; marine power generation; renewable generation connection; wide area monitoring systems; wind power generation;
  • fLanguage
    English
  • Journal_Title
    Power Engineer
  • Publisher
    iet
  • ISSN
    1479-8344
  • Type

    jour

  • Filename
    4168453