DocumentCode :
822953
Title :
Improved Testability Provisions for Boiling Water Reactors
Author :
McGrath, J.N.
Author_Institution :
Philadelphia Electric Company Philadelphia, Pennsylvania
Volume :
23
Issue :
1
fYear :
1976
Firstpage :
782
Lastpage :
784
Abstract :
Safety Systems (Emergency Core Cooling and Reactor trip) circuits at Peach Bottom were provided with complete, overlapping zone, on-line testability. This was accomplished by adding to and greatly expanding the coverage of the manufacturer installed test plugs. The general philosophy is that with proper insertion of test plugs, full logic initiation can be tested including valve operation and pump starts. No jumpers or lifted leads are required and injection into the core is defeated during test. These provisions simplified the testing program for Technical Specification (Tech Spec) requirements and eased licensing considerations. Although applied to a BWR, the principles outlined are applicable to any system or plant using digital inputs.
Keywords :
Circuit testing; Cooling; Inductors; Licenses; Logic testing; Manufacturing; Plugs; Safety; System testing; Valves;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1976.4328343
Filename :
4328343
Link To Document :
بازگشت