Title :
Real-Time Backup Systems for Programmable Controllers
Author :
Flood, Mark A. ; Struger, Odo J.
Author_Institution :
Allen-Bradley Co., Programmable Controller Business Systems Division, Highland Heights, OH 44143.
Abstract :
Programmable controllers (PC´s), conceived in 1968 by a team of engineers at G. M.´s Hydramatics Division, have experienced a revolutionary development and gone through four generations of design in a decade. The exponential increase of functional capability was accompanied by a similar development trend in the I/O area from passive I/O modules to intelligent I/O and distributed I/O systems. As these programmable controllers became larger, their chip count increased substantially and, thus, their meantime between failures (MTBF) was lowered despite use of LSI and highly reliable components (¿-values substantially above industrial grade) with elevated temperature ratings (85°C) and adherence to conservative component stress levels.
Keywords :
Central Processing Unit; Communication system control; Computer displays; Control systems; Electrical equipment industry; Floods; Industrial control; Programmable control; Real time systems; Road transportation;
Journal_Title :
Industrial Electronics, IEEE Transactions on
DOI :
10.1109/TIE.1982.356677