The Electron-Positron Storage Ring Petra, Plans and Status
Author :
Voss, Gustav-Adolf
Author_Institution :
Deutsches Elektronen-Synchrotron DESY Notkestr. 85, 2000 Hamburg 52, W. Germany
Volume :
24
Issue :
3
fYear :
1977
fDate :
6/1/1977 12:00:00 AM
Firstpage :
1842
Lastpage :
1844
Abstract :
Construction of the Electron-Positron Storage Ring PETRA was authorized October 20, 1975. At present most of the civil engineering work is completed and ring installation work is under way. All major components are on order and series production of bending magnets, quadrupoles, vacuum chambers and rf-resonators has started. Start-up of the machine is planned with a fourfold symmetry configuration with four active beam-beam interaction points. Five experimental facilities have been recommended for the first round of experiments scheduled to begin mid 79.
Keywords :
Civil engineering; Magnets; Optical beams; Orbital calculations; Production; Resonance; Satellites; Stimulated emission; Storage rings; Structural beams;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1977.4329105
Filename :
4329105
Link To Document :
بازگشت