DocumentCode
830484
Title
The Electron-Positron Storage Ring Petra, Plans and Status
Author
Voss, Gustav-Adolf
Author_Institution
Deutsches Elektronen-Synchrotron DESY Notkestr. 85, 2000 Hamburg 52, W. Germany
Volume
24
Issue
3
fYear
1977
fDate
6/1/1977 12:00:00 AM
Firstpage
1842
Lastpage
1844
Abstract
Construction of the Electron-Positron Storage Ring PETRA was authorized October 20, 1975. At present most of the civil engineering work is completed and ring installation work is under way. All major components are on order and series production of bending magnets, quadrupoles, vacuum chambers and rf-resonators has started. Start-up of the machine is planned with a fourfold symmetry configuration with four active beam-beam interaction points. Five experimental facilities have been recommended for the first round of experiments scheduled to begin mid 79.
Keywords
Civil engineering; Magnets; Optical beams; Orbital calculations; Production; Resonance; Satellites; Stimulated emission; Storage rings; Structural beams;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1977.4329105
Filename
4329105
Link To Document