Economical Design of Utility-Scale Photovoltaic Power Plants With Optimum Availability
Author :
Moradi-Shahrbabak, Zahra ; Tabesh, Ahmadreza ; Yousefi, G.R.
Author_Institution :
Dept. of Electr. & Comput. Eng., Isfahan Univ. of Technol., Isfahan, Iran
Volume :
61
Issue :
7
fYear :
2014
fDate :
Jul-14
Firstpage :
3399
Lastpage :
3406
Abstract :
This paper presents an algorithm for the economical design of a utility-scale photovoltaic (PV) power plant via compromising between the cost of energy and the availability of the plant. The algorithm inputs are the plant peak power and the price of inverters with respect to their power ratings. The outputs are the optimum inverter ratings and the interconnection topology of PV panels. This paper introduces the effective levelized cost of energy (LCOE) (ELCOE) index as the core of the proposed design algorithm. ELCOE is an improved index based on the conventional LCOE that includes the availability of a power plant in economical assessments. The conventional LCOE index determines centralized topology (e.g., 1-MW inverter for a 1-MW PV power plant) for minimizing the energy generation cost, whereas based on ELCOE, a multistring topology (e.g., a 1-MW PV plant consists of fifty 20-kW inverters) despite of higher investment cost becomes the economically winning topology. Given the price of commercially available PV inverters at present, the case studies in this paper show that, for 0.1-100-MW PV power plants, the economical ratings of inverters range from 8 to 100 kW. The recently installed PV power plants confirm the feasibility of the calculations based on the suggested algorithm.
Keywords :
invertors; photovoltaic power systems; power generation economics; power system interconnection; power system planning; ELCOE index; PV inverters; PV panels; economical design; effective levelized cost of energy index; energy generation cost; interconnection topology; optimum availability; optimum inverter ratings; plant peak power; power 0.1 MW to 100 MW; power 1 MW; power 20 kW; power 8 kW to 100 kW; utility scale photovoltaic power plants; utility-scale PV power plant; Availability; Inverters; Maintenance engineering; Photovoltaic systems; Topology; Levelized cost of energy (LCOE); PV energy system reliability; PV plant topology design; photovoltaic (PV) power plants; power system availability; technoeconomical analysis;
fLanguage :
English
Journal_Title :
Industrial Electronics, IEEE Transactions on
Publisher :
ieee
ISSN :
0278-0046
Type :
jour
DOI :
10.1109/TIE.2013.2278525
Filename :
6579679
Link To Document :
بازگشت