DocumentCode
838340
Title
Isochronism Studies at IUCF
Author
Friesel, D.L. ; Jones, W.P. ; Kowalski, E.A.
Author_Institution
Indiana University Cyclotron Facility
Volume
26
Issue
2
fYear
1979
fDate
4/1/1979 12:00:00 AM
Firstpage
2408
Lastpage
2410
Abstract
A non-intercepting, charge sensitive, sampling beam phase probe, similar to the design developed for the 15 MeV injector cyclotron, was recently installed on the moveable south valley probe of the Indiana 200 MeV main stage cyclotron. The probe permits continuous measurement of beam phase from inflection to extraction radius at beam intensities as low as 200 nanoamperes. The measured phase histories obtained show that small deviations from the predictions of our field mapping data are required for isochronous acceleration. The characteristics of the phase probe and the results of the beam phase measurements are discussed.
Keywords
Acceleration; Assembly; Coils; Cyclotrons; Magnetic field measurement; Particle beams; Phase measurement; Probes; Sampling methods; Schottky diodes;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1979.4329889
Filename
4329889
Link To Document