    Commissioning of the Argonne Intense Pulsed Neutron Source (IPNS-I) Accelerator

  • Author

    Rauchas, Antanas V. ; Brumwell, Franklin R. ; Volk, Gerald J.

  • Volume
    26
  • Issue
    3
  • fYear
    1979
  • fDate
    6/1/1979 12:00:00 AM
  • Firstpage
    3006
  • Lastpage
    3008
  • Abstract
    The IPNS-I 500 MeV Rapid Cycling Synchrotron (RCS) was commissioned during March of 1977. It was originally designed as an injection energy booster for the Zero Gradient Synchrotron (ZGS), as well as a source of high intensity proton beams for neutron production. With the termination of the high intensity operation of the ZGS, the accelerator became a dedicated machine for neutron physics. After a period of tuning and improving accelerator components, the accelerator officially began neutron physics experiments on July 1, 1978. The accelerator has achieved a repetition rate of 15 Hz with beams of 1 × 1012 protons delivered on target. Operation at 30 Hz is expected soon. A description of the accelerator is presented. Turn on procedures, operating experience and initial performance problems are also discussed.
  • Keywords
    Acceleration; Ferrites; Magnetic flux; Magnetic resonance; Neutrons; Particle beams; Physics; Power supplies; Proton accelerators; Synchrotrons;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1979.4329920
  • Filename
    4329920