DocumentCode :
838815
Title :
Update on Power Generation in Canada to 2000 A. D.
Author :
Broe, K.L.
Author_Institution :
Canadian General Electric Co. Limited
Issue :
5
fYear :
1978
Firstpage :
1496
Lastpage :
1500
Abstract :
The original Paper appears in IEEE Transactions on Power Apparatus and Systems, January/ February 1977, Volume PAS-96, Number 2, pages 38 to 43. It covered the forecasting work done from June to December 1973, as part of the strategic planning process for Canadian General Electric´s Power Generation Business. The forecast covered the period 1973 to 2000 and included all hydraulic turbines and generators, fossil and nuclear turbine-generators, and gas turbine-generators, that were expected to be installed in Canada, by year, in this time frame.
Keywords :
Delay; Economic forecasting; History; Hydraulic turbines; Load forecasting; Nuclear power generation; Power & Energy Society; Power generation; Statistics; Strategic planning;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1978.354641
Filename :
4181589
Link To Document :
بازگشت