DocumentCode
838873
Title
Computational Implementation of On-Line Loadflow
Author
Emark, L.W., Jr.
Author_Institution
Westinghouse Electric Corporation
Issue
5
fYear
1978
Firstpage
1523
Lastpage
1537
Abstract
This paper describes a straightforward building method of initializing internal and external network system bus voltage and power injection operating levels for subsequent steady-state system security evaluation of planned and unplanned network contingency outages. Outages are of the line, tie-line, generator, or load loss type. The program can handle the opening of bus tie or jumper connections and the isolation of a bus or string of buses from the main part of the network. The routine´s main advantage is the automatic redistribution and makeup of tie-line P (MW) and Q (Mvar) flows from the external network. This algorithm has been implemented on the Iowa Illinois Gas and Electric Company (IIG&E) real-time control system; it is now under test and evaluation, and preliminary results are most favorable.
Keywords
Automatic generation control; Automatic voltage control; Circuits; Impedance; Monitoring; Power generation; Power system security; Steady-state; System buses; Voltage control;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1978.354645
Filename
4181593
Link To Document