DocumentCode
839798
Title
Closed Orbit Control System for Main Ring of KEK-PS
Author
Endo, Kuninori ; Ando, Ainosuke
Volume
26
Issue
3
fYear
1979
fDate
6/1/1979 12:00:00 AM
Firstpage
3328
Lastpage
3330
Abstract
Closed orbit deviations of the main ring of KEK-PS are corrected at injection by supplying individual currents to 56 steering dipoles placed downstream of quadrupole magnets. Half of them are used for the correction of the horizontal orbit and the rest for the vertical orbit. Correction is made by making a local closed orbit with three successive dipoles to negate the reading of the position monitor. With this system, the same procedures are repeated for all position monitors distributed around the main ring under the manual operation mode. The system also furnishes the online correction using the accelerator control computer by taking the beam position data into it.
Keywords
Cable shielding; Centralized control; Computerized monitoring; Control systems; Current supplies; Error correction; Magnets; Manuals; Power cables; Power supplies;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1979.4330025
Filename
4330025
Link To Document