DocumentCode
842414
Title
An evolutionary algorithm for resource-constrained project scheduling
Author
Hindi, Khalil S. ; Yang, Hongbo ; Fleszar, Krzysztof
Volume
6
Issue
5
fYear
2002
fDate
10/1/2002 12:00:00 AM
Firstpage
512
Lastpage
518
Abstract
The single-mode, single-project, resource-constrained project-scheduling problem is solved by an evolutionary algorithm. The design of this algorithm is presented. Results of a computational study on two sets of benchmark problems, the first consisting of 330 problem instances and the second 2040, are presented. These results show that the proposed algorithm is effective in terms of the number of times it achieves both the best-known solutions and the average error with respect to these solutions, particularly given that the best-known solutions have been compiled from various sources, using a variety of algorithms. Moreover, the computation time requirements are quite modest
Keywords
genetic algorithms; project management; scheduling; average error; crossover operators; evolutionary algorithm; heuristics; mutation operators; resource-constrained project scheduling; sequences; Algorithm design and analysis; Costs; Evolutionary computation; Job shop scheduling; Machinery; Manufacturing; Processor scheduling; Research and development; Research and development management; Systems engineering and theory;
fLanguage
English
Journal_Title
Evolutionary Computation, IEEE Transactions on
Publisher
ieee
ISSN
1089-778X
Type
jour
DOI
10.1109/TEVC.2002.804914
Filename
1041558
Link To Document