• DocumentCode
    842414
  • Title

    An evolutionary algorithm for resource-constrained project scheduling

  • Author

    Hindi, Khalil S. ; Yang, Hongbo ; Fleszar, Krzysztof

  • Volume
    6
  • Issue
    5
  • fYear
    2002
  • fDate
    10/1/2002 12:00:00 AM
  • Firstpage
    512
  • Lastpage
    518
  • Abstract
    The single-mode, single-project, resource-constrained project-scheduling problem is solved by an evolutionary algorithm. The design of this algorithm is presented. Results of a computational study on two sets of benchmark problems, the first consisting of 330 problem instances and the second 2040, are presented. These results show that the proposed algorithm is effective in terms of the number of times it achieves both the best-known solutions and the average error with respect to these solutions, particularly given that the best-known solutions have been compiled from various sources, using a variety of algorithms. Moreover, the computation time requirements are quite modest
  • Keywords
    genetic algorithms; project management; scheduling; average error; crossover operators; evolutionary algorithm; heuristics; mutation operators; resource-constrained project scheduling; sequences; Algorithm design and analysis; Costs; Evolutionary computation; Job shop scheduling; Machinery; Manufacturing; Processor scheduling; Research and development; Research and development management; Systems engineering and theory;
  • fLanguage
    English
  • Journal_Title
    Evolutionary Computation, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1089-778X
  • Type

    jour

  • DOI
    10.1109/TEVC.2002.804914
  • Filename
    1041558