DocumentCode :
842414
Title :
An evolutionary algorithm for resource-constrained project scheduling
Author :
Hindi, Khalil S. ; Yang, Hongbo ; Fleszar, Krzysztof
Volume :
6
Issue :
5
fYear :
2002
fDate :
10/1/2002 12:00:00 AM
Firstpage :
512
Lastpage :
518
Abstract :
The single-mode, single-project, resource-constrained project-scheduling problem is solved by an evolutionary algorithm. The design of this algorithm is presented. Results of a computational study on two sets of benchmark problems, the first consisting of 330 problem instances and the second 2040, are presented. These results show that the proposed algorithm is effective in terms of the number of times it achieves both the best-known solutions and the average error with respect to these solutions, particularly given that the best-known solutions have been compiled from various sources, using a variety of algorithms. Moreover, the computation time requirements are quite modest
Keywords :
genetic algorithms; project management; scheduling; average error; crossover operators; evolutionary algorithm; heuristics; mutation operators; resource-constrained project scheduling; sequences; Algorithm design and analysis; Costs; Evolutionary computation; Job shop scheduling; Machinery; Manufacturing; Processor scheduling; Research and development; Research and development management; Systems engineering and theory;
fLanguage :
English
Journal_Title :
Evolutionary Computation, IEEE Transactions on
Publisher :
ieee
ISSN :
1089-778X
Type :
jour
DOI :
10.1109/TEVC.2002.804914
Filename :
1041558
Link To Document :
بازگشت