Installation of Detroit Edison gas insulated substations
Author
Hathaway, George H. ; Sparks, Ward W.
Author_Institution
The Detroit Edison Company, Detroit, Michigan
Volume
94
Issue
5
fYear
1975
Firstpage
1608
Lastpage
1617
Abstract
This paper discusses the installation of three Detroit Edison 120kV gas insulated substations - Caniff, Midtown and Cato. These substations, all located in Detroit, were installed between October 1972 and June 1973. Discussion topics include the shipment, foundation, assembly and wiring of metal enclosed components, SF6 gas processing and high voltage field testing.
Keywords
Adders; Assembly; Circuit breakers; Gas insulation; Packaging machines; Power transformer insulation; Springs; Substations; Sulfur hexafluoride; Switchgear;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/T-PAS.1975.32002
Filename
1601604
Link To Document