    Virtual building for construction projects

  • Author

    Sheppard, L.M.

  • Volume
    24
  • Issue
    1
  • fYear
    2004
  • Firstpage
    6
  • Lastpage
    12
  • Abstract
    Although computer-aided design is widely used in the architecture-engineering-construction (AEC) industry, the exchange of information is still largely a manual process, where 2D paper drawings are reviewed to identify conflicts. Obviously, this process is time consuming and inefficient - not only do many conflicts go undetected but it´s nearly impossible to quickly determine how design changes will affect the project´s cost and schedule. Thus, an average project will lose 8 to 15 percent of labor costs due to mistakes that cause change orders, delays, and rework. Project management tools also have limitations. Since they use critical path method schedules, such tools don´t show the three dimensions of space and the fourth dimension of time, making it difficult to visualize and communicate the schedule and analyze the sequence of construction. Enter 4DCAD technology, which in its simplest form links 3D models to schedules.
  • Keywords
    architectural CAD; construction industry; data visualisation; solid modelling; 3D model; 4DCAD technology; architecture-engineering-construction industry; computer-aided design; construction project; critical path method schedule; data visualization; information exchange; project management tool; virtual building;
  • fLanguage
    English
  • Journal_Title
    Computer Graphics and Applications, IEEE
  • Publisher
    ieee
  • ISSN
    0272-1716
  • Type

    jour

  • DOI
    10.1109/MCG.2004.1255800
  • Filename
    1255800