Title :
Criteria used by Canadian utilities in the planning and operation of generating capacity
Author_Institution :
Power Syst. Res. Group, Saskatchewan Univ., Saskatoon, Sask., Canada
fDate :
11/1/1988 12:00:00 AM
Abstract :
The author reviews the reliability criteria used by Canadian utilities in regard to planning and operating generating capacity. These results have been obtained from surveys conducted by the Power System Reliability Subsection of the Canadian Electrical Association. These surveys cover both operating and planning generating capacity criteria. In the case of adequacy assessment, a comparison of the different utility criteria is presented using the IEEE Reliability Test System. It is concluded that virtually all Canadian utilities now use probabilistic techniques in planning future-generating-capacity requirements
Keywords :
electric power generation; electricity supply industry; probability; reliability; Canadian utilities; IEEE Reliability Test System; Power System Reliability Subsection; adequacy assessment; future-generating-capacity requirements; generating capacity; operation; planning; probabilistic techniques; reliability criteria; Appraisal; Capacity planning; Power engineering and energy; Power generation; Power system planning; Power system reliability; Power systems; Security; Systems engineering and theory; Testing;
Journal_Title :
Power Systems, IEEE Transactions on