• DocumentCode
    850755
  • Title

    System of choice

  • Author

    Phadke, A.G.

  • Volume
    6
  • Issue
    5
  • fYear
    2008
  • Firstpage
    20
  • Lastpage
    22
  • Abstract
    Wide-area measurements have been an integral part of power system operations for over six decades. They have been used in economic dispatch and automatic generation control systems in electric utility control centers using real-time measurements of power flows on remote tie lines and generator output powers. In the late 1960s a new class of wide-area measurement systems came into use--supervisory control and data acquisition (SCADA) systems--in order to provide real-time state estimates of the power system in the electric utility energy management systems (EMSs). Over the years, the "real time" in these SCADA-based measurements came to imply measurements performed over a data window of several seconds without regard to the precise instant when the measurements were made.
  • Keywords
    Automatic generation control; Control systems; Power generation; Power generation economics; Power industry; Power measurement; Power system economics; Power system measurements; Real time systems; Wide area measurements;
  • fLanguage
    English
  • Journal_Title
    Power and Energy Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    1540-7977
  • Type

    jour

  • DOI
    10.1109/MPE.2008.927471
  • Filename
    4610290