Title :
Operation of an isolated hydro plant supplying an HVDC transmission load
Author :
Chapma, D.G. ; Jost, F.A.
Author_Institution :
Manitoba Hydro, Winnipeg, Manitoba
fDate :
7/1/1976 12:00:00 AM
Abstract :
Manitoba Hydro´s Kettle Generating Station, situated on the Nelson River in northern Manitoba, is an isolated hydro-electric plant supplying power directly to Radisson HVDC rectifier station. Some characteristics of this transmission system require the control systems to have special features to ensure successful operation of the generating station. The important system characteristics, the problems they can cause and the solution of the problems through control features are described.
Keywords :
AC generators; Bridges; Control systems; Frequency; HVDC transmission; Meetings; Printing; Rivers; Societies; Torque;
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
DOI :
10.1109/T-PAS.1976.32202