Title :
Three-phase testing facilities at EPRI´s project UHV
Author :
Comber, Michael G. ; Doyle, Joseph R. ; Schneider, Herman M. ; Zaffanella, Luciand E.
Author_Institution :
General Electric Company, Pittsfield, Massachusetts
Abstract :
A description is given of the expanded facilities at Project UHV for the study of UHV ac transmission up to 1500 kV. These include a three-phase test line for full scale tests on a large variety of line configurations, three single phase transformers for 1500 kV line-to-line, much associated electrical and mechanical equipment, and instrumentation for the acquisition of electrical and meteorological data. The three-phase UHV test line has been energized since January 1975 and full scale testing on 1000 - 1500 kV transmission lines is in progress.
Keywords :
Aluminum; Books; Capacitors; Circuit testing; Corona; Lightning; Loss measurement; Phase transformers; Phased arrays; Power transformer insulation;
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
DOI :
10.1109/T-PAS.1976.32258