DocumentCode :
852687
Title :
Design, Development and Installation of a Wide Range Fission Chamber System a Summary
Author :
Wyckoff, R.D. ; Miller, J.F. ; Kroon, J.C.
Author_Institution :
Maine Yankee Atomic Power Company Wiscasset, Maine
Volume :
28
Issue :
1
fYear :
1981
Firstpage :
745
Lastpage :
748
Abstract :
The failure rate of B-10 lined proportional counters at the Maine Yankee PWR was excessively high and an intensive search was begun in 1976 for a solution to this problem. This paper addresses the salient aspects of the discovery through to the resolution of the failures. It encompasses the data and viewpoints of the three co-operating organizations, namely the plant, the system vendor and the detector supplier.
Keywords :
Cable shielding; Counting circuits; Detectors; Face detection; Inductors; Instruments; Interference; Personnel; Preamplifiers; Testing;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1981.4331271
Filename :
4331271
Link To Document :
بازگشت