Establishing Goals and Functions for a Plant-Wide Disturbance Analysis and Surveillance System (DASS)
Author
Rumancik, J.A. ; Easter, J.R. ; Campbell, L.A.
Author_Institution
Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, Pennsylvania 15230
Volume
28
Issue
1
fYear
1981
Firstpage
905
Lastpage
912
Abstract
This paper discusses part of the work performed for the Electric Power Research Institute under contract RP891-3 for the development of a plant-wide Disturbance Analysis and Surveillance System (DASS) for nuclear power plants. Specifically, a process is developed that allows the DASS design team to maintain control over the scope (number of) and depth (detail) of the plant systems and equipment which must be modelled in order to produce a diagnostic tool which reactor operators should find helpful in recognizing the nature of and in coping with unexplained plant transients.
Keywords
Cathode ray tubes; Computer displays; Contracts; Europe; Inductors; Performance analysis; Power generation; Power system modeling; Surveillance; System testing;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1981.4331302
Filename
4331302
Link To Document