DocumentCode
853400
Title
Installation of the first bulk power 380 kV underground transmission cable system in Saudi Arabia
Author
Schneider, P. ; Wada, Y. ; Yoshida, N. ; Miura, I.
Author_Institution
Lahmeyer Int. GmbH, Frankfurt, West Germany
Volume
3
Issue
4
fYear
1988
fDate
10/1/1988 12:00:00 AM
Firstpage
1318
Lastpage
1325
Abstract
The design, manufacture, testing and installation of the 380 kV long-distance bulk power underground transmission line installed in Jeddah, Kingdom of Saudi Arabia, are discussed. The line consists of two routes with a length of 14.2 km and 12.6 km, respectively. It has a double circuit of 380 kV, 1600-mm2, self-contained oil-filled cable directly buried in the ground. It is expected that some of the techniques developed for this project will be applicable to other, similar projects in the Middle East region
Keywords
underground cables; underground transmission systems; 380 kV; Jeddah; Saudi Arabia; long-distance bulk power underground transmission line; self-contained oil-filled cable; Conductivity; Cooling; Costs; Oil filled cables; Power cables; Power generation; Roads; Soil measurements; Substations; Thermal resistance;
fLanguage
English
Journal_Title
Power Delivery, IEEE Transactions on
Publisher
ieee
ISSN
0885-8977
Type
jour
DOI
10.1109/61.193926
Filename
193926
Link To Document