DocumentCode :
853763
Title :
A practical design for an integrated HVDC unit-connected hydro-electric generating station
Author :
Ingram, Lindsay
Author_Institution :
Manitoba HVDC Res. Centre, Winnipeg, Man., Canada
Volume :
3
Issue :
4
fYear :
1988
fDate :
10/1/1988 12:00:00 AM
Firstpage :
1615
Lastpage :
1621
Abstract :
The cost of a significant amount of plant and facilities found in conventional schemes can be eliminated by integrating HVDC substations directly with generating units. The results of a study to quantify these benefits are outlined. An actual hydroelectric power station design was used, incorporating a HVDC thyristor valve scheme in a hypothetical situation. The financial and other benefits determined for this example are presented together with conclusions and recommendations for future projects and further areas of study
Keywords :
DC power transmission; hydroelectric power stations; substations; DC power transmission; HVDC substations; hydroelectric power station; projects; AC generators; Costs; Filters; HVDC transmission; Power generation; Power system interconnection; Rivers; Thyristors; Transformers; Valves;
fLanguage :
English
Journal_Title :
Power Delivery, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8977
Type :
jour
DOI :
10.1109/61.193962
Filename :
193962
Link To Document :
بازگشت