The Tennessee Valley Authority´s (TVA´s) experience and action plans with freestanding oil-filled current transformers (CTs)
Author
Boyle, John R. ; Cummings, Harold ; Arp, Barry
Author_Institution
Tennessee Valley Authority, Chattanooga, TN, USA
Volume
3
Issue
4
fYear
1988
fDate
10/1/1988 12:00:00 AM
Firstpage
1769
Lastpage
1775
Abstract
Historical background data are provided on current transformer (CT) failures, and some initial, unsuccessful attempts to correct the problem are discussed. Attempts to detect incipient failures by sampling the oil periodically revealed the weaknesses and hazards in the initial program. A task force was established to develop safety procedures that would minimize hazards to personnel working in the areas of suspect oil-filled CTs. The task force also developed an online monitoring device that detects incipient failures so that CTs can be removed from service before catastrophic failures occur
Keywords
automatic test equipment; current transformers; failure analysis; insulating oils; transformer insulation; CT failures; Tennessee Valley Authority; failure detection; freestanding oil-filled current transformers; hazards; incipient failures; online monitoring device; Condition monitoring; Explosives; Hazards; Manufacturing; Personnel; Petroleum; Safety; Semiconductor device manufacture; Senior members; Voltage;
fLanguage
English
Journal_Title
Power Delivery, IEEE Transactions on
Publisher
ieee
ISSN
0885-8977
Type
jour
DOI
10.1109/61.193983
Filename
193983
Link To Document