DocumentCode :
85482
Title :
A Multi-Stage Stochastic Non-Linear Model for Reactive Power Planning Under Contingencies
Author :
Lopez, J.C. ; Contreras, Javier ; Munoz, Jose I. ; Mantovani, Jose Roberto S.
Author_Institution :
Dept. of Electr. Eng., Sao Paulo State Univ. - UNESP, Ilha Solteira, Brazil
Volume :
28
Issue :
2
fYear :
2013
fDate :
May-13
Firstpage :
1503
Lastpage :
1514
Abstract :
This paper presents a model for long-term reactive power planning where a deterministic nonlinear model is expanded into a multi-stage stochastic model under load uncertainty and an N-k contingency analysis. Reactive load shedding is introduced in the objective function to measure the reactive power deficit after the planning process. The objective is to minimize the sum of investment costs (IC), expected operation costs (EOC) and reactive load shedding costs optimizing the sizes and locations of new reactive compensation equipment to ensure power system security in each stage along the planning horizon. An efficient scenario generation and reduction methodology is used for modeling uncertainty. Expected benefits are calculated to establish the performance of the expected value with perfect information (EVPI) and the value of the stochastic solution (VSS) methodologies. The efficacy of the proposed model is tested and justified by the simulation results using the Ward-Hale 6-bus and the IEEE 14-bus systems.
Keywords :
investment; load shedding; power system planning; power system security; power system simulation; reactive power; stochastic systems; IEEE 14-bus system; N-k contingency analysis; Ward-Hale 6-bus system; deterministic nonlinear model; expected operation costs; investment costs; load uncertainty; long-term reactive power planning; multistage stochastic model; multistage stochastic nonlinear model; objective function; power system security; reactive compensation equipment; reactive load shedding; stochastic solution; Linear programming; Load modeling; Mathematical model; Planning; Reactive power; Stochastic processes; Uncertainty; Contingencies; expected benefits; multi-stage; reactive power planning; scenario tree; stochastic programming; uncertainty modeling;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/TPWRS.2012.2226250
Filename :
6374719