DocumentCode :
859361
Title :
Los Alamos Proton Storage Ring Extraction System
Author :
Hudgings, Daniel W. ; Jason, Andrew J.
Author_Institution :
Los Alamos National Laboratory, Los Alamos, NM 87545
Volume :
28
Issue :
3
fYear :
1981
fDate :
6/1/1981 12:00:00 AM
Firstpage :
2791
Lastpage :
2793
Abstract :
The unprecedented peak and average proton currents and extraction rates from the Proton Storage Ring (PSR) under construction at the Los Alamos National Laboratory present new problems in beam extraction. Activation caused by beam spill must be minimal to permit hands-on maintenance. Timing requirements are uncommonly stringent. Solutions to these problems are outlined below.
Keywords :
Electrodes; Jitter; Laboratories; Neutrons; Particle beams; Protons; Storage rings; Structural beams; Timing; Transmission lines;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1981.4331914
Filename :
4331914
Link To Document :
بازگشت