DocumentCode :
865760
Title :
Status of the VICKSI Accelerator Facility and Its Improvement by the Addition of a Tandem
Author :
Arndt, P. ; Busse, W. ; Martin, B. ; Michaelsen, R. ; Pelzer, W. ; Renner, D. ; Spellmeyer, B. ; Ziegler, K.
Author_Institution :
Hahn-Meitner-Institut fÿr Kernforschung Berlin GmbH, Bereich Kern- und Strahlenphysik, Berlin, Germany
Volume :
30
Issue :
2
fYear :
1983
fDate :
4/1/1983 12:00:00 AM
Firstpage :
1374
Lastpage :
1376
Abstract :
A general description of the VICKSI accelerator facility is given including its experimental facilities. Its operation and its operational limits are explained as well as the improvements of VICKSI by the addition of an 8 MV tandem as alternate injector. The status and timetable for the tandem project is given.
Keywords :
Acceleration; CAMAC; Cyclotrons; Ion accelerators; Magnets; National electric code; Optical design; Particle beams; Structural beams; Voltage;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1983.4332536
Filename :
4332536
Link To Document :
بازگشت