DocumentCode :
869886
Title :
Managing load data at Virginia Power
Author :
Tweed, Norman B., Jr. ; Stites, Brandon E.
Volume :
5
Issue :
1
fYear :
1992
Firstpage :
25
Lastpage :
29
Abstract :
The use of real-time data and what is referred to as semi-real-time data for asset management is described. The basic premise behind asset management is to utilize existing facilities to full capacity before installing new ones. Facility load data is made readily available to various company departments (such as metering, substation band system protection, budgeting, marketing, system planning, and division planning) as well as system and division operations by tying information networks together. Having access to this data allows unique approaches to reliability and efficiency in serving customers.<>
Keywords :
load management; power system computer control; Virginia Power; asset management; budgeting; division planning; efficiency; load data management; marketing; metering; reliability; substation protection; system planning; system protection; Asset management; Capacity planning; Distributed parameter circuits; Energy management; Load management; Power system management; Power system planning; Real time systems; SCADA systems; Substations;
fLanguage :
English
Journal_Title :
Computer Applications in Power, IEEE
Publisher :
ieee
ISSN :
0895-0156
Type :
jour
DOI :
10.1109/67.111468
Filename :
111468
Link To Document :
بازگشت