DocumentCode
870078
Title
120-GeV Proton Transport for Antiproton Production in the Fermilab Tevatron I Project
Author
Colton, Eugene ; Vat, Carlos Hoj ; Oleksiuk, Les
Author_Institution
Argonne National Laboratory
Volume
30
Issue
4
fYear
1983
Firstpage
2818
Lastpage
2820
Abstract
Short bunches of 120 GeV protons will be used for the production of 8 GeV antiprotons. Protons will be extracted vertically from the Main Ring using two high field Lambertson type magnets at location F17. The beam transport is made of three sections: horizontal dispersion cancellation, vertical dispersion cancellation and final focusing. The final focusing section is composed of two quadrupole doublets and allows for variation in à values at the target from 1.5 m to 20.0 m.
Keywords
Colliding beam accelerators; Contracts; Cooling; Foot; Laboratories; Lamination; Magnets; Particle beams; Production; Proton accelerators;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1983.4332965
Filename
4332965
Link To Document