Abstract
A knowledge-based expert system for generator maintenance scheduling is presented. In the proposed system, generator maintenance scheduling (GMS) is considered as a constrained optimization problem. For different system operation conditions the objective function varies. An operation index is presented to determine an appropriate strategy for a decision-making process. The Taiwan Power Company (TPC) implementation is described. Tests for TPC cases in 1986 and 1987 are presented using the developed prototype GMS expert system. The results can meet TPC GMS requirements, which were still based on manual approaches and other conventional methods. The solution feasibility is discussed
Keywords
electric generators; expert systems; maintenance engineering; power engineering computing; scheduling; GMS; TPC; Taiwan Power Company; constrained optimization; generator maintenance scheduling; knowledge-based expert system; operation index; Constraint optimization; Dynamic programming; Expert systems; Maintenance; Nuclear power generation; Power generation; Power system interconnection; Power system reliability; Scheduling; Senior members;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.207327
Filename
207327
Link To Document