DocumentCode :
879039
Title :
Using a semi-guided Monte Carlo method for faster simulation of forced outages of generating units
Author :
Scully, A. ; Harpur, A. ; Le, K.D., Sr. ; Day, J.T. ; Malone, M.J., Sr. ; Mousseau, T.E.
Author_Institution :
Electricity Supply Board, Dublin, Ireland
Volume :
7
Issue :
3
fYear :
1992
fDate :
8/1/1992 12:00:00 AM
Firstpage :
1313
Lastpage :
1321
Abstract :
The authors describe a semi-guided Monte Carlo technique to schedule forced outage periods of generating units. The key advantage of this method lies in its ability to create forced-outage schedules that are statistically balanced. When tested against the pure Monte-Carlo method, the semi-guided Monte Carlo technique provided much faster convergence and greatly reduced the number of Monte Carlo iterations required to produce reliable product cost results. The Electricity Supply Board of Ireland has implemented this technique in its chronological dispatch program
Keywords :
Monte Carlo methods; power stations; Electricity Supply Board of Ireland; chronological dispatch program; forced outages; generating units; semi-guided Monte Carlo; simulation; Costing; Costs; Fuels; Monte Carlo methods; Petroleum; Power system reliability; Production planning; Sampling methods; Strontium; Testing;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.207350
Filename :
207350