Title :
Kickers and Power Supplies for the Fermilab Tevafron I Antiproton Source
Author :
Castellano, T. ; Bartoszek, L. ; Tilles, E. ; Petter, J. ; McCarthy, J.
Author_Institution :
Fermi National Accelerator Laboratory, P.O. Box 500, Batavia, IL 60510
Abstract :
The Fermilab Antiproton Source Accumulator and Debuncher rings require 5 kickers in total. These range in design from conventional ferrite delay line type magnets, with ceramic beam tubes to mechanically complex shuttered kickers situated entirely in the Accumulator Ring´s 10-10 torr vacuum. Power supplies are thyratron switched pulse forming networks that produce microsecond width pulses of several kiloamps with less than 30 nanoseconds rise and fall times. Kicker and power supply design requirements for field strength, vacuum, rise and fall time, timing and magnetic shielding of the stacked beam in the accumulator by the eddy current shutter will be discussed.
Keywords :
Ceramics; Delay lines; Electron tubes; Ferrites; Magnets; Power supplies; Pulsed power supplies; Space vector pulse width modulation; Thyratrons; Timing;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1985.4334255