DocumentCode
883181
Title
FNAL Main Ring to Energy Saver Antiproton Transfer System for Tevatron I
Author
Dugan, G. ; Harrison, M. ; Dinkel, J. ; Krafczyk, G. ; May, M. ; Tilles, E.
Author_Institution
Fermilab, P.O. Box 500, Batavia, IL 60510
Volume
32
Issue
5
fYear
1985
Firstpage
3006
Lastpage
3008
Abstract
A system for antiproton beam transfer from the Main ring to the Energy Saver for colliding beam operations has been designed and fabricated. The system is similar to the existing proton beam transfer system used for fixed target operation of the Energy Saver. Using a fast kicker in the Main Ring, one or several bunches of 150 GeV pbars will be kicked horizontally across the septa of two Lambertsons into a short transfer line. At the end of this line, they are injected into the Energy Saver through two more Lambertsons and kicked onto a closed orbit by a second fast kicker. For commissioning and tune-up, the system will be operated in reverse, extracting 150 GeV protons from the Energy Saver to the Main Ring. In addition to a description of the design of the system and its components, the status of the installation and commissioning will also be discussed.
Keywords
Acceleration; Apertures; Colliding beam accelerators; Control systems; Educational institutions; Electrical capacitance tomography; Forward contracts; Lattices; Particle beams; Protons;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1985.4334256
Filename
4334256
Link To Document