DocumentCode :
883192
Title :
Proton Extraction and Transport for Pbar Production in Tevatron I
Author :
Dugan, G. ; Harrison, M. ; Johnson, D. ; Dinkel, J. ; Krafczyk, G. ; May, M. ; Merz, W. ; McCarthy, J. ; Tilles, E.
Author_Institution :
Fermilab, P.O. Box 500, Batavia, IL 60510
Volume :
32
Issue :
5
fYear :
1985
Firstpage :
3009
Lastpage :
3011
Abstract :
The design, fabrication, and commissioning of the extraction and beam transport systems required for pbar production for the FNAL Antiproton Source will be described. The extraction system utilizes a fast kicker and Lambertson septum magnets to extract in a single turn one booster batch of 120 GeV protons from the FNAL Main Ring. The extracted beam is transported a distance of 174 m by a beam transport system consisting of 12 dipoles and 14 quadrupoles. The last 8 quadrupoles are configured as 4 pairs which focus the beam to a small round spot (radius 0.4 mm) on a pbar production target. The extraction channel is also designed to inject 8 GeV cooled pbars from the Accumulator Ring into the Main Ring, or extract 8 GeV protons from the Main Ring for diagnostic and tune-up work in the Antiproton Source beam lines and rings.
Keywords :
Bandwidth; Batch production systems; Educational institutions; Fabrication; Magnets; Orbits; Particle beam injection; Particle beams; Protons; Testing;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1985.4334257
Filename :
4334257
Link To Document :
بازگشت