DocumentCode
883757
Title
Construction of the RFQ "TALL"
Author
Ueda, N. ; Mizobuchi, A. ; Nakanishi, T. ; Yamada, S. ; Tokuda, N. ; Hirao, Y.
Author_Institution
Institute for Nuclear Study, University of Tokyo, Midori-cho. Tanashi, Tokyo 188. Japan
Volume
32
Issue
5
fYear
1985
Firstpage
3178
Lastpage
3180
Abstract
An RFQ linac "TALL" is constructed. The machine is designed to accelerate heavy ions with charge to mass ratio of 1 to 1/7 from 8 up to 800 keV/u. It will be used as the first stage of an injector for a heavy ion synchrotron "TARN II" which is under construction at INS. The acceleration cavity is of four vane structure driven with loop coupling at 100 MHz. The cavity is 58 cm in diameter and 730 cm in length. No vane coupling ring is used. A field uniformity was obtained easily within an error of ± 6% azimuthally and ± 5% longitudinally by use of side and end tuners. The TE210 mode has a resonant frequency of 101.78 MHz, 0.93 MHz lower than that of the closest mode TE111.
Keywords
Acceleration; Blades; Boring; Ion sources; Linear particle accelerator; Resonant frequency; Steel; Structural beams; Synchrotrons; Tuners;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1985.4334311
Filename
4334311
Link To Document