• DocumentCode
    883757
  • Title

    Construction of the RFQ "TALL"

  • Author

    Ueda, N. ; Mizobuchi, A. ; Nakanishi, T. ; Yamada, S. ; Tokuda, N. ; Hirao, Y.

  • Author_Institution
    Institute for Nuclear Study, University of Tokyo, Midori-cho. Tanashi, Tokyo 188. Japan
  • Volume
    32
  • Issue
    5
  • fYear
    1985
  • Firstpage
    3178
  • Lastpage
    3180
  • Abstract
    An RFQ linac "TALL" is constructed. The machine is designed to accelerate heavy ions with charge to mass ratio of 1 to 1/7 from 8 up to 800 keV/u. It will be used as the first stage of an injector for a heavy ion synchrotron "TARN II" which is under construction at INS. The acceleration cavity is of four vane structure driven with loop coupling at 100 MHz. The cavity is 58 cm in diameter and 730 cm in length. No vane coupling ring is used. A field uniformity was obtained easily within an error of ± 6% azimuthally and ± 5% longitudinally by use of side and end tuners. The TE210 mode has a resonant frequency of 101.78 MHz, 0.93 MHz lower than that of the closest mode TE111.
  • Keywords
    Acceleration; Blades; Boring; Ion sources; Linear particle accelerator; Resonant frequency; Steel; Structural beams; Synchrotrons; Tuners;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1985.4334311
  • Filename
    4334311