Title :
Bessy Reaches Full Scale Operation
Author :
Muhaupt, G. ; Derikum, K. ; Egan-Krieger, G.v. ; Flebner, H.-H. ; Hoberg, H.G. ; Klotz, W.-D. ; Kuske, P. ; Lehr, H. ; Maier, R. ; Martin, M. ; Richter, R. ; Schiele, A. ; Schulz, L. ; Weihreter, E.
Author_Institution :
Berliner Elektronenspeicherring-Gesellschaft f?r Synchrotronstrahlung mbH (BESSY) Lentzeallee 100, D-1000 Berlin 33
Abstract :
The Berlin Storage Ring for Synchrotron Radiation (BESSY)1,2,3 is now running in routine operation with stored currents of 600 mA (multi-bunch operation) with lifetimes of 3 h (increasing to 6 h at lower currents). The beam cross sections at the source points are ¿X = 0.2 mm and ¿Z = 0.5 mm at 600 mA and ¿X = 0.2 mm and ¿Z = 0.15 mm at 10 mA. Injection rates are higher than 0.5 A/min. 26 experimental stations equipped with 16 monochromators are in operation. Additional information is given about single bunch operation, current limits and energy calibration of the electron beam by spin resonance depolarisation.
Keywords :
Calendars; Calibration; Electron beams; Energy consumption; ISO; Light sources; Resonance; Stimulated emission; Storage rings; Synchrotron radiation;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1985.4334370