  • Abstract
    This paper provides an extension of methods for computing reliability indices for substations which takes into account the permissible overload of the power transformer, the daily load cycle and emergency loading. Based on the reliability indices derived in this paper it is possible to determine a reliability criterion for the rating of the substation, the number of transformers and the reserve factor required, which have traditionally been based on conservative deterministic criteria.
  • Keywords
    Capacity planning; Frequency; Load modeling; Power engineering and energy; Power engineering computing; Power system reliability; Power transformers; Reliability engineering; Substations; Temperature dependence;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.1986.4335032
  • Filename
    4335032