DocumentCode :
890464
Title :
Link adopts FMS approach for plastics
Volume :
66
Issue :
2
fYear :
1987
fDate :
2/1/1987 12:00:00 AM
Firstpage :
26
Lastpage :
27
Abstract :
When Link 51´s plastics division decided to concentrate less on in-house production and more on contract work, it realised it would need the flexibility to adapt to change and the ability to produce components `right first time¿¿. To this end, the firm is operating on a just-in-time basis, which has meant a move to flexible manufacturing methods, as Rory Baxter reports.
fLanguage :
English
Journal_Title :
Production Engineer
Publisher :
iet
ISSN :
0032-9851
Type :
jour
DOI :
10.1049/tpe.1987.0031
Filename :
4937996
Link To Document :
بازگشت