DocumentCode
890464
Title
Link adopts FMS approach for plastics
Volume
66
Issue
2
fYear
1987
fDate
2/1/1987 12:00:00 AM
Firstpage
26
Lastpage
27
Abstract
When Link 51´s plastics division decided to concentrate less on in-house production and more on contract work, it realised it would need the flexibility to adapt to change and the ability to produce components `right first time¿¿. To this end, the firm is operating on a just-in-time basis, which has meant a move to flexible manufacturing methods, as Rory Baxter reports.
fLanguage
English
Journal_Title
Production Engineer
Publisher
iet
ISSN
0032-9851
Type
jour
DOI
10.1049/tpe.1987.0031
Filename
4937996
Link To Document