• DocumentCode
    890801
  • Title

    The New National Control Centre, Ireland

  • Author

    McDyer, F. ; Herger, K.

  • Author_Institution
    Electricity Supply Board (ESB), Dublin, Ireland
  • Volume
    2
  • Issue
    1
  • fYear
    1987
  • Firstpage
    85
  • Lastpage
    91
  • Abstract
    The new National Control Centre for the Electricity Supply Board (ESB), Ireland, currently undergoing site commissioning, will be in operation in September 1986. The Control Centre will control a single 2200 MW island network. The control centre is being supplied under a supply contract with Landis & Gyr, Zug, Switzerland. There is a high degree of customer participation and emphasis is laid on customer interfacing. The central hardware comprises a dual main 32-bit computer system with Virtual Memory Operating System, four dual front-end processors and four display processors. Remote Terminal Units communicate with the Control Centre on a private communication network, mostly Microwave and Power Line Carrier. This paper describes the control centre in a general way with emphasis on contractual arrangements, customer involvement and testing procedures.
  • Keywords
    Communication system control; Computer displays; Contracts; Control systems; Fuel economy; Power generation economics; Power system interconnection; Power system security; State estimation; Testing;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.1987.4335078
  • Filename
    4335078