DocumentCode
898134
Title
Combined active and reactive despatch. I. Problem formulation and solution algorithm
Author
Chebbo, A.M. ; Irving, M.R.
Author_Institution
Dept. of Electr. Eng. & Electron., Brunel Univ., Uxbridge, UK
Volume
142
Issue
4
fYear
1995
fDate
7/1/1995 12:00:00 AM
Firstpage
393
Lastpage
400
Abstract
A fully coupled active-reactive despatch using linear programming is presented. The purpose of combined active and reactive despatch (CARD) is to achieve the overall objective of minimum generation cost and/or to improve other system parameters, subject to constraints that ensure system security. CARD allows a series of time steps to be considered. The duration of each time stage may be chosen so that despatching points occur at any critical points of the predicted load curve within the despatch period. The problem is expanded such that the linear program variables include the output at the end of each time step, with the objective function value integrated over all stages. System constraints are replicated at each time stage. Dynamic rate limits are also included. The reactive power despatch is regarded as static within each step, but is influenced by the generator active power rate of change limitations
Keywords
control system synthesis; linear programming; load dispatching; optimal control; power control; power system control; power system security; reactive power control; active-reactive power despatch; control design; despatching points; dynamic rate limits; generation cost; linear programming; load curve; objective function; power systems; security; time steps;
fLanguage
English
Journal_Title
Generation, Transmission and Distribution, IEE Proceedings-
Publisher
iet
ISSN
1350-2360
Type
jour
DOI
10.1049/ip-gtd:19951976
Filename
404149
Link To Document