Title :
Controller testing facility on 32.5 MW water turbine
Author :
Winning, D.J. ; Aitken, K.H. ; Grant, N.F. ; Marshall, A.G. ; Findlay, D.G.E.
Author_Institution :
University of Glasgow, Department of Electronics and Electrical Engineering, Glasgow, UK
fDate :
11/1/1980 12:00:00 AM
Abstract :
As part of a collaborative programme of work between university and industry on the control of hydro-generating units supplying power to the UK national grid, equipment has been installed on a 32.5 MW unit which permits the testing of new controllers in a realistic, operational environment. A central feature of this equipment, which includes a new independent high-pressure servomotor, is that it permits the generating unit to be returned quickly to operational use with its existing controller. Full integration with the power station operator´s controls, automatic control scheme and protection, permit the controllers under test to be evaluated under normal operational conditions.
Keywords :
controllers; environmental testing; hydraulic turbines; machine testing; test facilities; 32.5 MW water turbine; controller testing facility; operational environment;
Journal_Title :
Generation, Transmission and Distribution, IEE Proceedings C
DOI :
10.1049/ip-c.1980.0056