DocumentCode
902215
Title
CDF level 2 trigger upgrade
Author
Anikeev, K. ; Bogdan, M. ; Demaat, R. ; Fedorko, W. ; Frisch, H. ; Hahn, K. ; Hakala, M. ; Keener, P. ; Kim, Y. ; Kroll, J. ; Kwang, S. ; Lewis, J. ; Lin, C. ; Liu, T. ; Marjamaa, F. ; Mansikkala, T. ; Neu, C. ; Pitkanen, S. ; Reisert, B. ; Rusu, V. ; San
Author_Institution
Fermi Nat. Accel. Lab., Batavia, IL, USA
Volume
53
Issue
2
fYear
2006
fDate
4/1/2006 12:00:00 AM
Firstpage
653
Lastpage
658
Abstract
We describe the new CDF Level 2 Trigger, which was commissioned during Spring 2005. The upgrade was necessitated by several factors that included increased bandwidth requirements, in view of the growing instantaneous luminosity of the Tevatron, and the need for a more robust system, since the older system was reaching the limits of maintainability. The challenges in designing the new system were interfacing with many different upstream detector subsystems, processing larger volumes of data at higher speed, and minimizing the impact on running the CDF experiment during the system commissioning phase. To meet these challenges, the new system was designed around a general purpose motherboard, the PULSAR, which is instrumented with powerful FPGAs and modern SRAMs, and which uses mezzanine cards to interface with upstream detector components and an industry standard data link (S-LINK) within the system.
Keywords
SRAM chips; field programmable gate arrays; nuclear electronics; particle detectors; CDF level 2 trigger upgrade; FPGA; PULSAR; S-LINK; SRAM; Tevatron; mezzanine cards; upstream detector subsystems; Bandwidth; Computer buffers; Detectors; Field programmable gate arrays; Hardware; Instruments; Phase detection; Physics; Robustness; Springs; FPGA based hardware; real-time systems; trigger;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.2006.871782
Filename
1621380
Link To Document