Title :
Discussion on Electrification of Taiwan main-line railway from Keelung to Kaohsiung
fDate :
9/1/1984 12:00:00 AM
Abstract :
It is of particular pleasure to me to join in this discussion, as I was in the consultancy team working in the early 1970s whose report led to the project. It is interesting, and does credit to the team members, that the implemented project follows so closely the recommendations made in 1971. There are a few differences, and I shall ask some questions about those differences.
Keywords :
electric locomotives; electromagnetic interference; harmonics; power systems; railways; statistical analysis; 25 kV AC; Taiwan; communication equipment; electrification; harmonic frequencies; interference; multiple passenger units; power equipment; power-system behaviour; railway; statistical evaluation; telecommunication cable system; tests of system performance; thyristor-controlled electric locomotives; Railway electrification and transportation;
Journal_Title :
Electric Power Applications, IEE Proceedings B
DOI :
10.1049/ip-b:19840030